Friday, September 30, 2005

ATA 5/55

Horizontal Stabilizer
Airworthiness Directive (AD) 89-12-08 has a 300-hr. horizontal stabilizer inspection requirement, and AD 96-24-11 has a 600-hr. aileron push-pull tube/guider roller inspection requirement. However, operators need to be aware that Chapter 5 of the Maintenance Manual requires them to be accomplished at 200-hr. and 400-hr. intervals, respectively. Please make sure that your maintenance facility is aware of this and makes the proper logbook entries.

No comments:

Post a Comment